Thanks for contacting us.
We'll be in touch soon.
Otherwise, call us directly in our Sydney Office.
+61 2 8006 8155
Oops! Something went wrong while submitting the form.

Living Lab

No items found.
Client:
Mirvac
Project Type:
Workplace
Status:
Complete
Year:
2016
Location:
200 George Street, Sydney NSW
Website:
Architect:
Davenport-Campbell
Builder:
Mirvac
Image sources:
Meld Strategies

About
This Project

As part of the Mirvac Smart Tenancy project, Meld Strategies developed a ‘Living Lab’ at Mirvac HQ.

The Living Lab provided tenancy performance feedback with the objective to provide an ongoing design feedback loop that will help designers to assess the performance of both the base building and the Mirvac tenancy.
The Living Lab measured:

Performance of the closed cavity facade using external and internal pyranometers, cavity and glass surface temperature sensors.

Floor slab vibrations using specialist vibration sensors.

Indoor air quality measurements.

This development was designed to achieve a minimum:
1.
2.
3.
4.

Project Engagement

Project engagement on this development was in the following technology areas:
Research
Strategy Development
Documentation
Detailed Design
Schematic Design
Detailed Design
Presentations
Functional Requirements
Design Coordination
Technical Project Management

Scope

The basis of the strategy was to use sensors and meters to capture real time information on the current conditions of the indoor environment and the building structure.

All data is stored in a cloud based database that can be used by multiple analytics and dashboard systems.

The solution makes use of a range of sensors and meters from different manufacturers working together to help inform the staff, visitors and facilities managers of the current performance of the Mirvac tenancy floors.